Identity · owner-action
Legal entity, registered address, and jurisdiction of formation are not yet declared.
AINBIS operating blueprint · elevator-mcp-completeness-pack-engine
Regulatory compliance
regional multifamily and mixed-use property managers with 3-40 elevator-equipped buildings (Colorado Front Range beachhead, Fairfax County VA secondary)
Every elevator and escalator an owner operates needs a written, equipment-specific Maintenance Control Program under ASME A17.1 §8.6, with maintenance, callback, and FEO-test records retained roughly five years and viewable on-site. But the MCP usually lives with whichever vendor wrote it, most owners have never reviewed it, and Colorado and Fairfax County both now treat a missing or incomplete MCP as an inspection-failure condition — not a footnote.
On MCPVault Clear, facilities coordinators stop guessing whether their elevators will pass a documentation review and start proving it. Upload the MCP, vendor logs, callback history, and machine-room photos; AI extracts and gap-scores the file against the adopted ASME A17.1 §8.6 / AHJ checklist, and a compliance analyst — with a licensed elevator consultant/QEI on escalation for missing-MCP-authorship or contested code interpretation — releases a Completeness Pack, a vendor chase kit, and a dated vault index.
[
{
"body": "Upload the MCP, vendor logs, callback history, inspection reports, and machine-room photos for one building or conveyance. Each document gets a document ID on arrival, and unit IDs and vendor names are canonicalized against your building roster — ambiguous matches go to a human, not a guess.",
"title": "Intake: upload the building file"
},
{
"body": "AI OCRs and classifies the file, matches it to the adopted ASME A17.1 §8.6 checklist for your AHJ edition (Colorado 7 CCR 1101-8, Fairfax County Elevator Program), and checks the MCP for equipment-specificity and coverage-timeline completeness.",
"title": "Extract and match against the AHJ checklist"
},
{
"body": "No MCP, no on-site accessibility instructions, under-5-year retention where required, and missing FEO tests where required all run through versioned deterministic gates — never a language model's judgment call — and each hard gap cites its checklist clause and evidence pointer.",
"title": "Score hard gaps in deterministic rules"
},
{
"body": "A compliance analyst reviews the gap matrix and releases green and yellow packs. Missing-MCP-authorship and contested code-interpretation cases escalate — a hand-off, not a rejection — to a licensed elevator consultant/QEI, who releases the red pack.",
"title": "Human release gate"
},
{
"body": "The Completeness Pack PDF, vendor chase kit, and dated vault index land in your folder the same release cycle. QA runs a second-pass sample against anti-fabrication checks before anything ships.",
"title": "Deliver the pack and chase kit"
},
{
"body": "If you've purchased the Chase Desk, we track vendor cure evidence until hard gaps close. Portfolio Desk buildings get a quarterly re-scan on the calendar, and every failed inspection or AHJ comment feeds back into the checklist library.",
"title": "Watch the vendor cure and the next re-scan"
}
]Identity · owner-action
Legal entity, registered address, and jurisdiction of formation are not yet declared.
Trust boundary · verified
Public page is a validation microsite for a documentation-readiness support service; not an AHJ agent, not an elevator inspector, and not an engineering firm.
SEO integrity · verified
No fake review, rating, LocalBusiness, or Organization identity schema is emitted; no inspection-pass or penalty-avoidance claims without the actual-outcomes-vary caveat.
Regulated claims · release-blocker
Elevated trust burden — ASME A17.1 §8.6 / AHJ-adjacent claims gated on owner facts: named licensed elevator consultant/QEI engagement letter, entity identity, and counsel review of engagement terms and disclaimers.
Manifest coverage · assumed
Manifest-backed blueprint present in source repository (2026-07-13 build, Elevator MCP Completeness Pack Engine run).
Passed: 20; total: 20; coverage: 100.